Cost Estimate & Tenders Management Services

Canadian Consulting services Inc.

Hiring Top-Notch Estimators
is Now One-step Away!

CCS provides a supportive service to ensure that the organization sees the cost reduction hitting the bottom-line. This service is ideal for organizations that do not have the internal capability and/or capacity to manage contract effectively, or do not see this function as core business and looking to outsource.

Cost Estimate & Tenders Management Solutions

Our team has full knowledge about tender life cycle based on buildings & infrastructure projects. By using very advanced estimation softwares, very high accuracy and quality are guaranteed.

Cost Estimation

Rough estimate, Budgeting, Cost analysis, Cost breakdown, Data base

Pricing BOQ

Full pricing for all BOQ items including civil, electrical and mechanical works

Cost Reporting

Cash flow, Budget forecasting, Resources usage, wastage

Effective Procurement

Manage all suppliers and subcontractor’s packages, detailed comparison sheets & Strong negotiation to reach the bottom rock

Contract Review & Risk Analysis

Review contract documents, providing full risk analysis and related cost impact

Tender Management

Tender circulars and related effects, Pre & Post tender clarifications and very advanced tender presentation

Fields of Expertise

At CCS, we are proud to offer a wide range of quantity surveying services for each project phase (Planning, Design, Tender and Construction phases), which cover different types of projects

Building Projects

  • Airports
  • Museums
  • Stadiums
  • VIP
  • Special Construction
  • Office
  • Retail
  • Commercial
  • Hotels
  • Public Facilities
  • Industrial
  • Healthcare
  • Educational
  • Fit-out Work
  • FF&E
  • Residential Housing
  • Renovations
  • Precast Concrete
  • Post-tension Concrete
  • Prestressed Concrete

Infrastructure projects

  • Bridges
  • Tunnels
  • Flexible Paving
  • Rigid Paving
  • Micro Tunneling
  • Deep Shafts
  • Dewatering System
  • Piling Works
  • Foul System
  • Surface Water & Ground Water System
  • Treated Sewage Effluent TSE Pipeline
  • Potable Water System
  • Firefighting System
  • Foul Sewer Lifting Station
  • Surface Water Treatment Plant
  • Potable Water Pumps Station & Reservoir
  • TSE Pump Station & Reservoir
  • Firefighting Pumps Station & Reservoir
  • High Voltage Cables Network
  • Medium Voltage Cables Network
  • Low Voltage Cables Network
  • Electrical Substations
  • Street Lighting
  • Landscaping
  • Earthworks
Your Best Choise

Hire Our Professional Cost Estimation Experts!

At CCS, we don’t just make, monitor and control the budget from the start till the end, we also get involved in the contracting phase; prepare invoices of material and progress, and view change orders of contract, while resolving any contractual issue that might occur during the project implementation.

Edge Softwares

Full Cost Estimation process is done through the most advanced softwares

Highest KPIs

Out of ten (10) tenders , one to four (1 to 4) tenders are awarded successfully

Early Submission

Guaranteed submissions at least 3 days before the specified deadlines

Professional Management

Adequate control through all tender phases, while maintaining progress on due dates